Announcement

Collapse
No announcement yet.

Gensokyo V3 Building Meeting!

Collapse
X
Collapse
Who has read this thread:
  • Filter
  • Time
  • Show
Clear All
new posts

    Summary for the 33rd Gensokyo v3 Building Meeting 7/21/2018:
    *ctrl+c* *ctrl+v*
    Communication is key, during the breaks we have between these meetings talk to others about projects, work on things etc. etc.
    Since the Forest of Magic terraforming is basically done, Koko thinks it's safe to port in buildings that are located in it.
    However that is for the Forest of Magic only.
    Pro-tip for terraforming so you're not suffering. Just terraform the area around the place you're porting in. Saves more time, saves more lives.

    Disclaimer: I was not AWOL.

    The meeting started at 4:10 PM EST with the presence of Eiburine, TRXD, Redleaf64, DariruKuro & Nicolas_Akushi.
    The group swiftly moved to the Lunar Capital Build Site (tm), at this point in time Krittercon joined the squad, after Nicolas_Akushi guided the tour through the newly decorated Temple to The Gods the group discussed different ideas for the interior design of said temple, and what could be added and/or fixed of it, and following said topic, the interior for the Halls of Amaterasu and Tsukuyomi interior designs were discussed as well, concluding, in words of Krittercon "Just put a giant ass statue and a couple carpets" (or something along the lines).

    Later the meeting was conducted into the 4th floor of the Hall of Purity where Glennkabob had furbished the totally-not-lore-related office of Eirin Yagokoro before being banished into Earth with Kaguya Houraisan. This later transformed into a tour of little fixes of important parts of the building, arranged by Krittercon, as well as a rework of the Council Room on the first floor of the building. (we still need to put australia in the map kthx)

    Finally, the group concluded the meeting after redesigning the interior of the 3rd floor of the Hall of the Divine which, before looked like a bar, and has now been properly adorned with a giant tea table, and both a sand garden and a koi pond.

    And so, the 33rd build meeting for the Gensokyo Project on the Yukkuricraft server ended at 5:50 PM EST.

    P.S. Now Dari is the overlord of the Planet Confederacy

    As a side note, we are preparing a teaser trailer for the Project itself. Be sure to check it out by clicking on this link for further information.

    NEXT BUILD MEETING: August 4th, 2018 4PM EST
    Sometimes you have to accept the fact that certain things will never go back to how they used to be.

    Comment


      Summary for 34th meeting etc etc

      *ctrl+c* *ctrl+v*
      Communication is key, during the breaks we have between these meetings talk to others about projects, work on things etc. etc.
      Since the Forest of Magic terraforming is basically done, Koko thinks it's safe to port in buildings that are located in it.
      However that is for the Forest of Magic only.
      Pro-tip for terraforming so you're not suffering. Just terraform the area around the place you're porting in. Saves more time, saves more lives.

      Meeting started 1:20 PST (4:20 Blaze it EST) with TRXD, Eiburine, birb, 9_cirno_9, Redleaf64, Righto, Dari kinda, and myself.

      We went to the sdm and talked about statues and gardens. That's basically all we did.

      Later in the meeting we started to build rather than talk so yeah

      check previous posts for teaser trailer info

      Next build meeting: August 28th, 2018 4PM EST

      Comment


        Hi I've returned.

        The deadline for the Gensokyo Trailer builds is on September 1st, make sure to have them finished and reported on the forums. In this thread!


        Next building meeting is on August 18th, 2018 4PM EST.

        don't listen to that fatty above

        Comment


          Summary for the 29th Gensokyo v3 Building Meeting 8/18/2018:
          *ctrl+c* *ctrl+v*
          Communication is key, during the breaks we have between these meetings talk to others about projects, work on things etc. etc.
          Since the Forest of Magic terraforming is basically done. I think it's safe to port in buildings that is located in the forest of magic.
          However that is for the Forest of Magic only.
          Pro-tip for terraforming so you're not suffering. Just terraform the area around the place you're porting in. Saves more time, saves more lives.


          We started off examining Chireiden's exterior. The walls looked a bit plain. We came to a conclusion that it needed more detail.
          After that we went to check if any new things were added to the sdm. The 2nd floor has mostly been furnished. With just a bit of touch ups needed.

          An interesting happened in which everyone understood a meme that I didn't understand. I felt really bullied and was at a loss.

          That's about it, the meeting lasted for an hour!

          The deadline for the Gensokyo Trailer builds is on September 1st, make sure to have them finished and reported on the forums. In this thread!

          Next building meeting is on September 1st, 2018 4PM EST.
          summary is late bc jackbox shenanigans

          Comment


            Summary for the 30th Gensokyo v3 Building Meeting 9/1/2018:
            *ctrl+c* *ctrl+v*
            Communication is key, during the breaks we have between these meetings talk to others about projects, work on things etc. etc.
            Since the Forest of Magic terraforming is basically done. I think it's safe to port in buildings that is located in the forest of magic.
            However that is for the Forest of Magic only.
            Pro-tip for terraforming so you're not suffering. Just terraform the area around the place you're porting in. Saves more time, saves more lives.


            We started off by looking at The waterfall Katrix worked on for the new youkai mountain. It had mist and water drop particles powered by a command block.

            We then took a look at the caves Yukibara worked on that leads into the Subterranean Animism stages.

            I went afk a bit for this part, but 9_Cirno_9 asked a question on where the toad'd pond will be after the new Youkai Mt. gets ported in. For now the answer is "We do not know".

            We took at Chireiden again and gave more advice to Eiburine on how she could improve it and work on the walls and layout.

            Meeting last for about 2 hours!

            The deadline for the Gensokyo Trailer builds has been extended to September 30th, make sure to have them finished and reported on the forums. In this thread!

            Next building meeting is on September 15th, 2018 4PM EST.
            Last edited by KokoButtz; 09-01-2018, 11:43 PM.

            Comment


              Summary for the 30th Gensokyo v3 Building Meeting 9/15/2018:
              *ctrl+c* *ctrl+v*
              Communication is key, during the breaks we have between these meetings talk to others about projects, work on things etc. etc.
              Since the Forest of Magic terraforming is basically done. I think it's safe to port in buildings that is located in the forest of magic.
              However that is for the Forest of Magic only.
              Pro-tip for terraforming so you're not suffering. Just terraform the area around the place you're porting in. Saves more time, saves more lives.


              This was an actual building, building meeting. TRXD and Eiburine lead most of the pack with the SDM garden. We spent and good 5 hours planning and discussing the sections of the garden and what things we should have and what should go where.

              Meanwhile Katrix worked on the new Youkai Mountain waterfall and ported in the new Youkai Mountain in NeoGensokyo. There was an error in the scaling so he smoothed out the edges where the old and new youkai mountain met.

              The deadline for the Gensokyo Trailer builds has been extended to September 30th, make sure to have them finished and reported on the forums. In this thread!

              Next building meeting is on October 6th, 2018 4PM EST.

              I'm also planning another building day on the 29th and 30th of September but nothing has been set in stone yet, so please wait the following week for more information.

              Comment

              Working...
              X